 |
 |
| |
|
|
| |
|
|
|
|
General
Contracting & Historic Restoration |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
enjoy
the music ! |
|
 |
| |
|
|
Little
Rascals Orchard
Harvard,
Mass. |
 |
Old
Bromfield School
Harvard,
Mass. |
 |
This
Project Consisted of: Restoration to the
existing Residence and Barn, New "
Post and Beam" Great Room with Slate
and Copper throughout, new full size Commercial
Kitchen, Offices, Full Working farm and
Orchard.
"The
Pride of Harvard, Mass." |
This Project Consisted
of: Restorartion of Exterior Woodwork, Painting,
New Copper Gutters, Flashings, Roofing, Downspouts,
Extensive Slate Repairs.
| |
|
|
Jamaica
Plain Spanish 7th Day Adventist Church
Jamaica Plain, Mass.
|
 |
St.
Vincent DePaul Church
South Boston, Mass.
|
 |
This
Project Consisted of:100 % Masonry Repointing,
New "2 color" Slate Roofing,
Repair/Rebuild Exterior Woodwork,
New Stained Glass Windows,
Structural Stabilization, 100 % Painting,
New Copper Gutters and Downspouts. |
This
Project Consisted of:100 % Masonry Repointing,
New Slate and Asphalt Roofing, Repair/ Rebuild
Exterior Woodwork,
New Operable Stained Glass Windows, 100%
Painting,
New Copper Gutters and Downspouts, H.V.A.C.
Upgrades,
New 80 foot high Boiler Flue, and New Drainage
System.
One of
the Oldest Churches in Boston ! |
| |
|
 |
 |
Fernald
Center Power Plant
Waltham, Mass. |
 |
Torrent
Fire House
Lowell, Mass.
|
 |
This Project Consisted
of: Structural Stabilization,
New Steel Decking,
New P.V.C.Roofing and Roof Drainage System,
Copper Flashings, Rebuild Skylight,
New H.V.A.C., Electrical Upgrades, Lead
Paint Removal,
Asbestos Abatement, and New Lighting System.
The Fernald
Center has been HELPING families for many
years !
Let's keep it open so they can continue
their great work ! |
This
Project Consisted of:100% Slate Roofing
Repairs, New Copper Gutters and Downspouts,100%
Masonry Repointing, New Windows, Repair
Exterior Metal Cornices,
100% Painting, and New Fire Engine Exhaust.
|
 |
 |
Dedham
Superior Court House
Dedham, Mass. |
 |
Dunkin Donuts
Boston, Mass. |
 |
| This Project Consisted of: Major
Repairs to The Existing Copper Dome, Columns,
Cornices, New Copper Gutters, Downspouts,
Conductors Heads, New " Genflex"
E.P.D.M. Roofing System, Slate Repairs, Repair/
Rebuild Exterior Woodwork, Painting. |
|
This Project Consisted of: New
Metal Siding, Roofing, Gutters, Soffits,
Downspouts.
Official approval
on all the projects completed at Dunkin
Donuts, from "Fred
the Baker"
before his retirement.
"Time
to make the Donuts"
|
|
First
Parish Church
serving
the community since 1630
Dorchester,
Ma.
Steeple
Repair Project
Above
Photo: from Left to Right
John
Hardiman ( Outside Superintendent ), John Pilling ( Pilling
+ Smith Architects ),
Brian
Hardiman ( Sheet Metal Foreman
),Dan
Bannon ( Project Foreman ), Jillian Adams ( Historic
Boston ),
Paul Hardiman ( Project Supervisor ), Carlos
Gomez ( Lanco Scaffolding
),
Rev. Arthur LaVoie ( Pastor ), Dan McKeeney ( Bosco Crane ), Jim
Fitzgerald ( Chappell Engineering
)
|
|
|
|
|
|
 |
|