Massachusetts Bay Community College |
|
|
|
|
Wellesley, MA This Project Consisted of: Removing existing H.V.A.C. system and Installing a new H.V.A.C. System,which included Chillers, Air Handling Units, Water Cooling Tower, Chilled Water / Condenser Water / Steam Piping, Plumbing, Electrical, Automatic Temperature Controls, Duct work, Pumps, Testing and Balancing, Insulation, Roofing, Louvers, Equipment Screen, Structural, and Concrete Cutting and Pads. |
|
Read more...
|
|
|
Upper Cape Cod Regional-Technical School |
|
|
|
|
Bourne, Mass. This Project Consisted of: Removing and Replacing: Heating & Ventilating Units, Dust Collecting System in Carpentry Shop, Kitchen Exhaust Fans and Ductwork, Rooftop Exhaust Fans, Duct Cleaning, Testing and Balancing of the Air and Hot Water System, New HVAC Insulation, New Roof Curbs with structural framing, New Roof Top Units (Natural Gas Heating and A/C), New Automatic Temperature Controls, New Welding Department Exhaust System, including Welding Booths, New Exhaust Systems in Masonry, Cosmetology, Plumbing, Auto body, Auto Mechanics, Upgrade Electrical, Fire Alarms, Carbon Monoxide Systems, and New Acoustical Ceiling in the Cafeteria. |
|
Read more...
|
|
|
|
|
|
|