Chinatown Park Chinatown section of Boston, Ma. New ventilation system for the underground vault, which houses the waterfall controls |
|
Read more...
|
|
|
Massachusetts Turnpike Authority |
|
|
|
|
Ted Williams Tunnel, Pump Station # 5 Boston, Mass. This Project Consisted of: Installing a new H.V.A.C. System which included a Type 316 Welded Stainless Steel Exhaust Duct System, with New Exhaust Fans, Make-Up Air Fans, Dehumidifier, Electrical, Insulation, Automatic Temperature Controls, Testing And Balancing, Concrete Forming, Structural Steel, Refrigeration, and Carbon Fitration System.
|
|
Read more...
|
|
Massachusetts Water Resources Authority |
|
|
|
|
Cottage Farm C.S.O.- Cambridge, Mass. This Project Consisted of: Removing the Existing Underground Ventilation System and Installing new P.V.C. Ductwork with type 316 Stainless Steel Hardware throughout, Heresite Coated Exhaust and Make-Up Air Fans, Exhaust Louver, Electrical, Testing and Balancing, Concrete Cutting, Structural Framing, and Roofing. P.V.C. and Stainless Steel is Made to Last in Corrosive Environments! |
|
Read more...
|
|
|
|
|
|
|