Home Services Clients Awards        
 
About Us
Our Work
     
     
 
     
 
HVAC
     
 
     
 
     
enjoy the music !

Massachusetts Bay
Community College

Wellesley, Mass.

General Contractor: Murphy Specialty, Inc.

Hold Control Key

Massachusetts Turnpike
Authority

Ted Williams Tunnel, Pump Station # 5 Boston, Mass.

General Contractor: Murphy Specialty, Inc.

Hold Control Key
This Project Consisted of: Removing existing H.V.A.C. system and Instaling a new H.V.A.C. System,which included Chillers, Air Handling Units, Water Cooling Tower, Chilled Water / Condenser Water / Steam Piping, Plumbing, Electrical, Automatic Temperature Controls,
Ductwork, Pumps, Testing and Balancing, Insulation, Roofing,
Louvers, Equipment Screen, Structural, and Concrete Cutting and Pads.

The Air Quality Was Greatly Improved !
This Project Consisted of: Installing a new H.V.A.C. System which included a Type 316 Welded Stainless Steel Exhaust Duct System, with New Exhaust Fans, Make-Up Air Fans, Dehumidifier, Electrical, Insulation, Automatic Temperature Controls, Testing And Balancing, Concrete Forming, Structural Steel, Refrigeration, and Carbon Fitration System.

Upper Cape Cod Regional
Technical School

Bourne, Mass.

General Contractor: Murphy Specialty, Inc.

 Hold Control Key

Vehicle Exhaust Systems

Various Cities and Towns

HVAC and Sheet Metal Contractor: Murphy Specialty, Inc.

 
This Project Consisted of: Removing and Replacing: Heating & Ventilating Units, Dust Collecting System in Carpentry Shop, Kitchen Exhaust Fans and Ductwork, Rooftop Exhaust Fans, Duct Cleaning, Testing and Balancing of the Air and Hot Water System, New HVAC Insulation, New Roof Curbs with structural framing, New Roof Top Units (Natural Gas Heating and A/C), New Automatic Temperature Controls, New Welding Department Exhaust System, including Welding Booths, New Exhaust Systems in Masonry, Cosmetology, Plumbing, Auto body, Auto Mechanics, Upgrade Electrical, Fire Alarms, Carbon Monoxide Systems, and New Acoustical Ceiling in the Cafeteria.

These Projects Consisted of:

Installing 100 % Source Capture Emergency Vehicle Exhaust Systems and Direct Ventilation Systems for Diesel and Gasoline Engine Exhaust, including Testing and Balancing,
carbonmonoxide detectors, ductwork, and electrical.
Some clients include:

Boston, Ma. Fire Department
Fall River, Ma. Fire Department
Jamestown, RI. Fire Department
Dudley, Ma. Fire Department

Army National Guard
Mansfield, Ma. D.P.W.
Bourne, Ma. D.P.W.
Bedford, Ma. D.P.W.


" Thanks to Murphy Specialty, Our Living Quarters and Working Conditions
are Much Cleaner and Healthier "

" Murphy Specialty is Dependable, provide Quailty Installations,
and have unbelievable Integrity "

Massachusetts License: CS # 56479
Rhode Island License: Sheet Metal Master 1 # 00007613

     
   

Massachusetts Water Resources Authority

Cottage Farm C.S.O.- Cambridge, Mass.

General Contractor: Murphy Specialty, Inc.

 Hold Control Key
 

This Project Consisted of: Removing the Existing Underground Ventilation System and Installing new P.V.C. Ductwork with type 316 Stainless Steel Hardware throughout, Heresite Coated Exhaust and Make-Up Air Fans, Exhaust Louver, Electrical, Testing and Balancing, Concrete Cutting, Structural Framing, and Roofing.

P.V.C. and Stainless Steel is Made to Last in Corrosive Environments!